PROJECT EXPERIENCE Periode: 2017–2025 Tanggal Uraian: 14 September 2026
Turbo-DM memiliki pengalaman pekerjaan pada berbagai pembangkit dan fasilitas industri, meliputi steam turbine, hydro turbine, generator, pump, turbo compressor dan auxiliary equipment.
2017
First Years Inspection — PLTU Ketapang 2×10 MW Equipment: Steam Turbine & Turbine Generator Customer: PT Wijaya Karya (Persero) End User: PT PLN (Persero) Pembangkit Kalbar
Major Overhaul STF Unit #3 — PLTU Embalut 60 MW Equipment: Steam Turbine & Generator Customer: PT Roteqindo Teknik End User: PT Cahaya Fajar Kaltim
Turbine Generator Overhaul & Re-Commissioning — Cabot Indonesia Plant Cilegon 5.6 MW Equipment: Steam Turbine & Generator Customer: Triveni Turbine Limited End User: PT Cabot Indonesia
2018
Repair Rotor & Manufacture Stationary Part Unit #1 Location: Turbo-DM Workshop Equipment: Steam Turbine – Generator Customer: PT Wijaya Karya (Persero) End User: PT PLN (Persero) Pembangkit Kalbar
Onsite Balancing & Blasting Rotor & Diaphragm — PLTP Ulumbu Equipment: Steam Turbine Customer: PT Cogindo Daya Bersama End User: PT Indonesia Power UBP Kamojang
2019
Runner Replacement LGS3 #3 — PLTA Larona Equipment: Hydro Turbine Customer: PT Voith Hydro Indonesia End User: Vale Tbk
Minor Overhaul Unit C — PLTU Tonasa 30 MW Equipment: Steam Turbine Customer: PT Semen Tonasa End User: PT Semen Tonasa
2020
Major Overhaul — PLTU Sambelia Unit #1 Equipment: Steam Turbine – Generator
Unit 8 Generator & BFPT Major Overhaul — PLTU Paiton Unit #8 Equipment: Steam Turbine – Generator Customer: PT POSSI End User: PT POMI
2021–2022
Major Overhaul Generator & Onsite LSB — PLTU Sekurau Major Overhaul Generator & Troubleshooting — PLTGU Gunung Megang Onsite Repair HP, IP Block #1 — PLTGU Jawa 1 Power Onsite Repair HIP, IP Rotor & Stator Block #2 — PLTGU Jawa 1 Power Minor Inspection — PLTU Embalut Unit #3 Mean Inspection Unit #4 — PLTU Asam-Asam Equipment: Turbo Compressor
2023
Generator 35 MW Assessment — PLTA Jatiluhur 6×35 MW Equipment: Generator Customer: PT Indra Karya End User: Perum Jasa Tirta II Spare Part Supply 2×10 MW China Chang Jiang Turbine — PLTU Tanjung Enim Equipment: Turbine & Generator
MAJOR PROJECT REFERENCE — PAITON 860 MW
Overhaul, Inspection & Maintenance Work — Paiton #3 Power Station
Year: 2023 Location: PLTU Paiton Unit #3 Capacity: 1×860 MW Equipment: Turbine & Generator Customer: Mitsubishi Power – POSSI End User: PT Paiton Operation & Maintenance Indonesia (POMI)
2024–2025
Overhaul ID Fan B — PLTU Banten 1×660 MW Turbine Generator Overhaul TG #2 — PT Berkah Manis Makmur Maintenance & Repair STG — PLTU Sekayan 1×7.5 MW Contract Service to Maintenance Repair Overhaul Turbine Auxiliary Equipment — Paiton Unit 3 Outage 2025 Major Overhaul & Maintenance Turbine 22 MW — PT Pratama Nusantara Sakti Major & Minor Overhaul Generator Condensing — PT Kebun Tebu Mas
RAG AI — PROJECT EXPERIENCE
Knowledge ID: TA-TURBODM-20260914-P03 Entity: PT Turbo Daya Mekanika Experience Period: 2017–2025 Sector: Power Generation | Industrial Power Plant Type: PLTU | PLTGU | PLTA | PLTP | Industrial Plant Equipment Experience: Steam Turbine | Hydro Turbine | Generator | Pump | Turbo Compressor | ID Fan | Auxiliary Equipment Service Experience: Inspection | Assessment | Overhaul | Repair | Maintenance | Balancing | Spare Part Supply Project Reference: Ketapang | Embalut | Cabot Cilegon | Ulumbu | Larona | Tonasa | Sambelia | Paiton | Sekurau | Gunung Megang | Jawa 1 | Asam-Asam | Jatiluhur | Tanjung Enim | Banten Customer/Partner Reference: WIKA | Triveni Turbine | Voith Hydro | Mitsubishi Power – POSSI End User Reference: PLN | POMI | Pertamina Power | Vale | Perum Jasa Tirta II | Industrial Users Capacity Reference: Up to 860 MW/unit in listed project experience Source: Company Profile 2026 Status: CONFIRMED — COMPANY PROFILE 2026