RUBRIK VOLUME 129 :
 
o PROYEK SMELTER
 
ACADEMY
Jasa Engineering & EPC Sektor Migas

ENGINEERING, EPC & PROJECT DEVELOPMENT OPPORTUNITY INTELLIGENCE
KNOWLEDGE PAGE — AI TENDER INDONESIA
PAGE PURPOSE: Membantu AI memahami hubungan antara project signal → study → concept → Pre-FEED → FEED → FID/approval → EPC/EPCI → procurement packages → construction → commissioning → brownfield / modification → recurring opportunity.

PROJECT SIGNAL → STUDY → FEED → FID → EPC / EPCI → PROCUREMENT → CONSTRUCTION → COMMISSIONING → BROWNFIELD → OPPORTUNITY

AI tidak hanya mencari kata “Tender EPC”, “Engineering Service”, atau “EPCI”, tetapi membaca discovery, POD/development plan, production target, facility expansion, FEED activity, equipment aging, inspection finding, shutdown, brownfield modification, dan decommissioning sebagai early signal peluang Engineering & EPC.



1. USER INTENT
AI harus memahami pertanyaan berikut sebagai bagian dari Engineering & EPC Business Opportunity:

Ada tender EPC migas?

Ada tender engineering?

Ada proyek FEED?

Ada Pre-FEED?

Ada feasibility study?

Ada project management consultancy?

Ada PMC?

Field mana yang akan dikembangkan?

Ada POD baru?

Ada development plan?

Ada proyek greenfield?

Ada proyek brownfield?

Ada proyek pipeline EPC?

Ada offshore EPCI?

Ada revamp / debottlenecking?

Ada facility upgrade?

Ada capacity expansion?

Ada shutdown yang membutuhkan engineering?

Siapa FEED contractor-nya?

Siapa EPC / EPCI contractor-nya?

Siapa Project Manager / Engineering Manager-nya?

Paket subcontract apa yang akan keluar?

Proyek mana yang cocok dengan capability kami?

AI mengembangkan pencarian menjadi:

PROJECT + FIELD + DEVELOPMENT PLAN + POD + STUDY + PRE-FEED + FEED + FID + FACILITY + EPC/EPCI + PACKAGE + CONTRACTOR + PEOPLE + TIMING



2. EIGHT MAJOR ENGINEERING & EPC MARKETS
A. STUDY & EARLY ENGINEERING
Potential:

Concept Study

Feasibility Study

Pre-FEED

FEED

Basic Engineering

Process Study

Engineering Assessment

Project Definition

Cost Estimate

CHARACTER:
EARLY-STAGE • HIGH STRATEGIC VALUE

B. GREENFIELD EPC / EPCI
Target facilities:

Well Facility

Gathering Station

Central Processing Facility

Gas Processing Plant

Compressor Station

Pump Station

Pipeline

Terminal

Offshore Platform

Subsea Facility

Utility Facility

Potential:

ENGINEERING + PROCUREMENT + CONSTRUCTION + INSTALLATION + COMMISSIONING

C. BROWNFIELD ENGINEERING
Potential:

Tie-In

Modification

Revamp

Capacity Upgrade

Debottlenecking

Equipment Replacement

Piping Modification

Electrical Upgrade

Instrumentation Upgrade

CHARACTER:
RECURRING • EXISTING-ASSET DRIVEN

D. PIPELINE EPC
Potential lifecycle:

Route Study

↓

Survey

↓

Engineering

↓

Material Procurement

↓

ROW

↓

Construction

↓

Welding

↓

NDT

↓

Hydrotest

↓

Commissioning

↓

PIPELINE EPC OPPORTUNITY
E. OFFSHORE EPCI
Potential:

Jacket

Topside

Wellhead Platform

Offshore Pipeline

Subsea Equipment

Brownfield Tie-In

Offshore Modification

Hook-Up

Offshore Installation

CHARACTER:
HIGH-VALUE • INTEGRATED DELIVERY

F. REVAMP / DEBOTTLENECKING
Trigger:

Production Increase

Capacity Limitation

Bottleneck

Reliability Issue

Efficiency Improvement

Revitalization

Optimization

↓

Engineering Study

↓

Modification

↓

Procurement

↓

Construction

↓

Commissioning

G. SHUTDOWN / TURNAROUND ENGINEERING
Potential:

Engineering Preparation

Tie-In

Equipment Replacement

Piping Modification

Electrical Modification

Instrument Modification

Construction

Testing

Recommissioning

SHUTDOWN = BROWNFIELD EXECUTION WINDOW
H. DECOMMISSIONING ENGINEERING
Potential:

Decommissioning Study

Isolation

Dismantling

Removal

Demolition

Waste Handling

Site Restoration

CHARACTER:
ASSET END-OF-LIFE DRIVEN


3. FIELD-DEVELOPMENT-TO-EPC LOGIC
INFORMATION:
“KKKS AKAN MENGEMBANGKAN LAPANGAN GAS BARU.”

AI jangan berhenti pada:

FIELD DEVELOPMENT

AI mengembangkan:

Discovery / Appraisal

↓

Development Plan / POD

↓

Concept Selection

↓

Pre-FEED

↓

FEED

↓

FID / Approval

↓

EPC / EPCI

↓

Construction

↓

Commissioning

↓

Production

↓

MULTI-YEAR ENGINEERING OPPORTUNITY
FIELD DEVELOPMENT INFORMATION = EARLY EPC SALES SIGNAL


4. POD / DEVELOPMENT-PLAN LOGIC
AI harus memahami:

POD / DEVELOPMENT PLAN

↓

Facility Concept

↓

Production Capacity

↓

Wells

↓

Surface Facility

↓

Pipeline

↓

Offshore / Onshore Infrastructure

↓

Project Schedule

↓

FEED

↓

EPC

↓

FUTURE ENGINEERING & SUPPLY OPPORTUNITY
Data yang perlu dicari:

FIELD:
KKKS:
DEVELOPMENT PLAN:
PRODUCTION TARGET:
FACILITY CONCEPT:
WELL COUNT:
PIPELINE:
ONSHORE / OFFSHORE:
START-UP TARGET:
FEED STATUS:
ENGINEERING CONTRACTOR:


5. FEED-TO-OPPORTUNITY LOGIC
FEED = GOLDEN INTELLIGENCE WINDOW
AI harus memahami bahwa FEED mulai menghasilkan:

Process Configuration

PFD

P&ID

Equipment List

Capacity

Plot Plan

Pipeline Design

Electrical Load

Instrumentation

Utility Requirement

Construction Philosophy

Cost Estimate

↓

EQUIPMENT DEFINED

↓

PACKAGE DEFINED

↓

SPECIFICATION EMERGING

↓

EPC SCOPE DEFINED

↓

MULTIPLE PROCUREMENT OPPORTUNITIES
FEED adalah sumber intelligence bagi seluruh supplier ecosystem.


6. FID / PROJECT-APPROVAL LOGIC
AI harus mengenali:

FID

Final Investment Decision

Project Approval

Investment Approval

Sanction

Project Go-Ahead

sebagai:

PROJECT MATURITY ↑

↓

EPC Procurement Approaching

↓

Financing / Budget Confirmed

↓

Construction Schedule More Certain

↓

HIGH-PRIORITY BUSINESS SIGNAL


7. EPC-AWARD LOGIC
Jika ditemukan:

EPC CONTRACT AWARDED
AI otomatis mengembangkan:

EPC Contractor

↓

Engineering

↓

Vendor List

↓

Material Requisition

↓

Procurement Packages

↓

Subcontract Packages

↓

Construction

↓

Testing / Commissioning

↓

HUNDREDS OF DOWNSTREAM OPPORTUNITIES
EPC AWARD = SUPPLY-CHAIN TRIGGER


8. PROJECT-TO-PACKAGE LOGIC
Contoh:

NEW GAS PROCESSING FACILITY
AI mengembangkan:

Process System

↓

Static Equipment

↓

Rotating Equipment

↓

Piping

↓

Electrical

↓

Instrumentation

↓

Civil / Structure

↓

Utility

↓

HSE

↓

ICT

↓

Construction

↓

Commissioning

↓

MULTIPLE EPC PACKAGES


9. EPC-PACKAGE MAP
CIVIL
Earthwork

Foundation

Building

Road

Drainage

MECHANICAL
Equipment Installation

Tank

Static Equipment

Rotating Equipment

PIPING
Pipe

Valve

Fitting

Support

Fabrication

Installation

ELECTRICAL
Transformer

Switchgear

MCC

Motor

Cable

INSTRUMENTATION
DCS

PLC

SIS

Field Instrument

Analyzer

PIPELINE
Line Pipe

Valve

Fitting

Coating

Construction

SUPPORT
Inspection

Survey

HSE

ICT

Manpower

Logistics

Catering

Medical

Water Treatment

ONE EPC PROJECT = MANY BUSINESS OPPORTUNITIES


10. CROSS-INTELLIGENCE LOGIC
Ini sangat penting untuk AI TENDER INDONESIA.

FEED START
→ Engineering Opportunity

EQUIPMENT LIST AVAILABLE
→ Equipment Supply Leads

P&ID AVAILABLE
→ Valve + Instrument + Pump + Piping Leads

EPC AWARD
→ Subcontract + Procurement Leads

PIPELINE PROJECT
→ Pipe + Valve + Survey + Construction + Restoration

OFFSHORE EPCI
→ Fabrication + Marine + HSE + Catering + Aviation

NEW CPF
→ M&E + Electrical + Instrumentation + Water Treatment

ONE ENGINEERING DATA POINT → MULTIPLE SUPPLY LEADS


11. PRODUCTION-TARGET-TO-BROWNFIELD LOGIC
Jika ditemukan:

“Target produksi akan dinaikkan.”

AI harus bertanya:

APAKAH EXISTING FACILITY MAMPU?

Lalu mengembangkan:

Production Target ↑

↓

Facility Capacity Review

↓

Bottleneck Analysis

↓

Engineering Study

↓

Debottlenecking

↓

Equipment Upgrade

↓

Modification

↓

POTENTIAL BROWNFIELD EPC OPPORTUNITY
AI harus memberi label:

INFERRED / POTENTIAL OPPORTUNITY
jika project belum confirmed.


12. EQUIPMENT-AGING-TO-ENGINEERING LOGIC
AGING EQUIPMENT

↓

Reliability Issue

↓

Inspection

↓

Finding

↓

Engineering Assessment

↓

Repair vs Replacement

↓

Design Modification

↓

Procurement

↓

Installation

↓

Commissioning

↓

BROWNFIELD ENGINEERING OPPORTUNITY


13. INSPECTION-FINDING-TO-EPC LOGIC
Contoh:

PIPELINE CORROSION

↓

Integrity Assessment

↓

Engineering Evaluation

↓

Repair / Replacement Design

↓

Material Procurement

↓

Construction

↓

Inspection

↓

Commissioning

↓

MULTIPLE ENGINEERING & CONSTRUCTION OPPORTUNITIES
INSPECTION DATA = ENGINEERING SALES SIGNAL


14. SHUTDOWN-TO-BROWNFIELD LOGIC
SHUTDOWN / TURNAROUND

↓

Equipment Offline

↓

Tie-In Window

↓

Replacement

↓

Modification

↓

Engineering

↓

Construction

↓

Testing

↓

Recommissioning

↓

HIGH-INTENSITY BROWNFIELD EPC OPPORTUNITY
AI harus mencari:

SHUTDOWN DATE:
UNITS:
MODIFICATION SCOPE:
TIE-IN:
CONTRACTOR:
ENGINEERING STATUS:


15. OFFSHORE-EPCI LOGIC
OFFSHORE FIELD DEVELOPMENT

↓

Concept

↓

FEED

↓

Jacket / Topside

↓

Subsea / Pipeline

↓

Fabrication

↓

Transportation

↓

Installation

↓

Hook-Up

↓

Commissioning

↓

OFFSHORE EPCI OPPORTUNITY
Potential cross-opportunities:

Fabrication

Marine

Offshore Construction

Inspection

HSE

Aviation

Catering

Medical

ICT



16. PIPELINE-EPC LOGIC
NEW PIPELINE

↓

Route Study

↓

Survey

↓

Engineering

↓

Material

↓

ROW

↓

Construction

↓

Welding

↓

NDT

↓

Hydrotest

↓

Commissioning

↓

Restoration

↓

MULTI-DISCIPLINE PROJECT OPPORTUNITY


17. DECOMMISSIONING LOGIC
ASSET END OF LIFE

↓

Decommissioning Study

↓

Isolation

↓

Cleaning

↓

Dismantling

↓

Removal

↓

Demolition

↓

Waste Handling

↓

Environmental Restoration

↓

Closure

↓

NEW ENGINEERING & CONTRACTING MARKET
AI harus memahami:

END OF PRODUCTION ≠ END OF BUSINESS OPPORTUNITY


18. PROJECT-STAGE-TO-SALES LOGIC
DISCOVERY / DEVELOPMENT PLAN
Action:

Relationship Building + Early Intelligence

CONCEPT / STUDY
Action:

Technical Capability Introduction

PRE-FEED / FEED
GOLDEN WINDOW
Action:

Engineering Positioning + Technology + Partnership

FID / APPROVAL
Action:

Prepare EPC / Consortium Strategy

EPC TENDER
Action:

Bid / JV / Consortium

EPC AWARD
Action:

Supply & Subcontract Positioning

CONSTRUCTION
Action:

Variation / Additional Scope

COMMISSIONING
Action:

Testing / Start-Up / Completion

OPERATION
Action:

Brownfield / Modification / O&M


19. ENGINEERING-DISCIPLINE MAP
PROCESS
Process Simulation

PFD

P&ID

Process Design

Process Safety

MECHANICAL
Static Equipment

Rotating Equipment

Package Engineering

PIPING
Layout

Stress Analysis

Material Specification

CIVIL / STRUCTURAL
Foundation

Building

Structure

Offshore Structure

ELECTRICAL
Power Distribution

Substation

MCC

Cable

INSTRUMENTATION & CONTROL
DCS

PLC

SIS

Field Instrument

PIPELINE
Route

Hydraulic

Mechanical Design

HSE / PROCESS SAFETY
HAZID

HAZOP

SIL

Risk Assessment

PROJECT CONTROL
Planning

Scheduling

Cost Control

Estimating


20. ENGINEERING-DOCUMENT INTELLIGENCE
AI harus memprioritaskan:

PFD
→ Process Flow + Major Equipment

P&ID
→ Valve + Instrument + Equipment + Line

EQUIPMENT LIST
→ Equipment Type + Quantity

LINE LIST
→ Piping Service + Material

ELECTRICAL LOAD LIST
→ Electrical Equipment Demand

MTO / BOQ
→ Material Quantity

DATASHEET
→ Technical Specification

PLOT PLAN
→ Facility Layout

PROJECT SCHEDULE
→ Procurement & Construction Timing

ENGINEERING DOCUMENT = SUPPLY-CHAIN INTELLIGENCE




21. OWNER-TO-EPC ECOSYSTEM
AI harus memahami:

KKKS / PROJECT OWNER
↓

DEVELOPMENT / PROJECT TEAM
↓

PMC / ENGINEERING CONSULTANT
↓

PRE-FEED / FEED CONTRACTOR
↓

EPC / EPCI CONTRACTOR
↓

FABRICATION YARD
↓

CONSTRUCTION CONTRACTOR
↓

SPECIALIST SUBCONTRACTOR
↓

EQUIPMENT / MATERIAL VENDOR
AI harus menjawab:

WHO DEFINES THE PROJECT?
WHO DESIGNS?
WHO PACKAGES?
WHO PROCURES?
WHO CONSTRUCTS?
WHO COMMISSIONS?


22. CONSORTIUM / JV LOGIC
AI harus memahami bahwa tidak semua perusahaan harus mengejar EPC sendiri.

Potential structure:

LOCAL ENGINEERING

INTERNATIONAL TECHNOLOGY

CONSTRUCTION COMPANY

SPECIALIST CONTRACTOR

↓

CONSORTIUM / JV
Possible roles:

Lead EPC

Local Partner

Engineering Partner

Construction Partner

Procurement Partner

Technology Partner

Specialist Subcontractor

AI harus melakukan:

CAPABILITY-GAP MATCHING


23. COMPANY-CAPABILITY DATABASE
COMPANY:
ROLE: Engineering / PMC / FEED / EPC / EPCI
DISCIPLINES:
ONSHORE EXPERIENCE:
OFFSHORE EXPERIENCE:
PIPELINE EXPERIENCE:
BROWNFIELD EXPERIENCE:
PROJECT VALUE RANGE:
ENGINEERING MANPOWER:
CONSTRUCTION CAPABILITY:
FABRICATION CAPABILITY:
PARTNERS:
CLIENT EXPERIENCE:
CURRENT PROJECT:
LOCATION:
KEY PERSON:
SOURCE / DATE:


24. CAPABILITY-TO-PROJECT MATCHING
AI mencocokkan:

PROJECT REQUIREMENT

dengan:

COMPANY CAPABILITY

Contoh:

COMPANY A
Strong Process + FEED
→ Fit: Early Engineering / Gas Processing

COMPANY B
Offshore Fabrication + Installation
→ Fit: Offshore EPCI

COMPANY C
Brownfield M&E + Piping
→ Fit: Facility Upgrade / Shutdown

↓

CAPABILITY-BASED OPPORTUNITY MATCHING


25. KEY PERSON MAP
OWNER / KKKS
Project Director

VP / GM Project

Development Manager

Project Manager

Engineering Manager

Facilities Manager

ENGINEERING
Engineering Manager

Lead Process Engineer

Lead Mechanical Engineer

Lead Piping Engineer

Lead Electrical Engineer

Lead Instrument Engineer

Pipeline Engineer

EPC
Project Director

Project Manager

Engineering Manager

Procurement Manager

Construction Manager

COMMERCIAL
SCM Manager

Contract Manager

Procurement Manager

Buyer

ACCESS FORMULA:
PROJECT / ENGINEERING + MANAGEMENT + PROCUREMENT


26. OPPORTUNITY TRIGGER
AI harus mengenali:

NEW DISCOVERY
→ Future Development Study

POD / DEVELOPMENT PLAN
→ Early Engineering Opportunity

PRE-FEED START
→ Engineering Window

FEED START
→ Golden Window

FID / PROJECT APPROVAL
→ EPC Approaching

EPC TENDER
→ Direct EPC Opportunity

EPC AWARD
→ Supply / Subcontract Opportunity

PRODUCTION TARGET INCREASE
→ Debottlenecking Potential

NEW WELL CAMPAIGN
→ Surface-Facility Modification Potential

EQUIPMENT AGING
→ Replacement Engineering

INSPECTION FINDING
→ Modification / Repair

SHUTDOWN
→ Brownfield Execution

DECOMMISSIONING
→ Removal / Restoration Engineering


27. OPPORTUNITY-SCORING LOGIC
AI dapat memberikan indicative score berdasarkan:

PROJECT MATURITY

POD / FEED STATUS

FID PROXIMITY

CAPEX / SCALE

FACILITY COMPLEXITY

CAPABILITY FIT

OWNER / EPC RELATIONSHIP

PARTNER AVAILABILITY

LOCAL PRESENCE

PROCUREMENT TIMING

↓

ENGINEERING / EPC OPPORTUNITY SCORE
HIGH
FEED advanced + FID approaching + capability fit strong.

MEDIUM
Project identified tetapi masih early.

LOW
Conceptual / uncertain / weak fit.

AI harus memberi label:

AI ASSESSMENT — NOT CONFIRMED PROCUREMENT
28. RECOMMENDED METADATA — PROJECT
PROJECT NAME:
KKKS / OWNER:
FIELD:
LOCATION:
ONSHORE / OFFSHORE:
PROJECT TYPE: Greenfield / Brownfield / Pipeline / Offshore
DEVELOPMENT PLAN / POD:
CAPACITY:
WELL COUNT:
PROJECT VALUE:
PROJECT STAGE:
PRE-FEED STATUS:
FEED STATUS:
FID STATUS:
PMC:
FEED CONTRACTOR:
EPC / EPCI:
CONSTRUCTION START:
START-UP TARGET:
SOURCE / DATE:

29. RECOMMENDED METADATA — ENGINEERING PACKAGE
PROJECT:
PACKAGE NAME:
DISCIPLINE:
SCOPE:
STUDY / FEED / EPC:
ENGINEERING CONTRACTOR:
DELIVERABLES:
START DATE:
COMPLETION DATE:
PROCUREMENT IMPACT:
FOLLOW-ON PACKAGE:
KEY PERSON:
SOURCE / DATE:

30. RECOMMENDED METADATA — EPC PACKAGE
PROJECT:
PACKAGE:
PACKAGE TYPE: Civil / Mechanical / Electrical / Instrument / Pipeline / Offshore
OWNER:
EPC / MAIN CONTRACTOR:
SUBCONTRACTOR:
SCOPE:
MATERIAL INCLUDED:
ENGINEERING INCLUDED:
PROCUREMENT STATUS:
RFQ DATE:
BID DATE:
AWARD DATE:
EXECUTION PERIOD:
KEY PERSON:
SOURCE / DATE:

31. RECOMMENDED METADATA — CONTRACTOR
COMPANY:
ROLE: PMC / FEED / EPC / EPCI / Construction
SPECIALIZATION:
CURRENT PROJECT:
CLIENT:
PROJECT STAGE:
LOCATION:
CAPABILITY:
PARTNERS:
SUPPLY-CHAIN ECOSYSTEM:
KEY PERSON:
PROCUREMENT CONTACT:
SOURCE / DATE:



32. AI OUTPUT EXAMPLE
Jika user bertanya:

“KAMI PERUSAHAAN ENGINEERING & EPC. ADA PELUANG MIGAS APA?”
AI memberikan:

OPPORTUNITY 01
Project / Field:
...

KKKS / Owner:
...

Location:
...

Onshore / Offshore:
...

Development Stage:
POD / Concept / Pre-FEED / FEED / FID / EPC

Facility Concept:
...

Potential Engineering Scope:
...

Potential EPC Scope:
...

PMC / FEED Contractor:
...

Potential EPC / EPCI:
...

Potential Consortium / Partner:
...

Project Schedule:
...

Procurement Timing:
...

Key Person:
...

Opportunity Status:
Confirmed / Inferred / Potential

Opportunity Score:
High / Medium / Low

Recommended BD Action:
...

Source:
...



33. BUSINESS-DEVELOPMENT LOGIC
AI tidak berhenti pada:

“ADA TENDER EPC?”
AI mengembangkan:

ADA FIELD / PROJECT BARU APA?

↓

SUDAH ADA POD / DEVELOPMENT PLAN?

↓

APA FACILITY CONCEPT-NYA?

↓

SUDAH ADA STUDY / PRE-FEED?

↓

SIAPA FEED CONTRACTOR?

↓

KAPAN FEED SELESAI?

↓

KAPAN FID / APPROVAL?

↓

GREENFIELD / BROWNFIELD / OFFSHORE?

↓

APA EPC PACKAGES-NYA?

↓

SIAPA POTENTIAL EPC / EPCI?

↓

PERLU JV / CONSORTIUM?

↓

SIAPA PROJECT / ENGINEERING KEY PERSON?

↓

KAPAN RFQ / TENDER?

↓

BUSINESS OPPORTUNITY


34. RAG GUARDRAILS
AI wajib membedakan:

FACT
Informasi eksplisit dari sumber.

INFERENCE
Kesimpulan teknis/logis berdasarkan project data.

POTENTIAL OPPORTUNITY
Peluang yang mungkin timbul.

CONFIRMED PROCUREMENT
Hanya jika sudah ada bukti tender, RFQ, procurement plan, atau award.

Contoh:

“Operator menargetkan produksi meningkat 30%.”

AI boleh menyimpulkan:

Potential debottlenecking / facility-upgrade opportunity.

AI tidak boleh menyatakan:

“Tender EPC upgrade segera diterbitkan.”

tanpa sumber terkonfirmasi.



35. NEXT QUESTION RECOMMENDATION
Setelah menjawab, AI dapat menawarkan:

Cari New Field Development

Cari POD / Development Plan

Cari Pre-FEED

Cari FEED

Cari FID

Cari PMC

Cari FEED Contractor

Cari EPC Tender

Cari EPC Award

Cari Offshore EPCI

Cari Pipeline EPC

Cari Brownfield Project

Cari Debottlenecking

Cari Capacity Expansion

Cari Shutdown Modification

Cari Decommissioning

Cari P&ID

Cari Equipment List

Cari Procurement Package

Cari Project Director

Cari Engineering Manager

Cari Procurement Manager

Cari JV / Consortium Partner

Cari Business Matching

AI TENDER INDONESIA
ENGINEERING & EPC OPPORTUNITY INTELLIGENCE
PROJECT SIGNAL → STUDY → PRE-FEED → FEED → FID → EPC / EPCI → PACKAGE → PROCUREMENT → CONSTRUCTION → COMMISSIONING → BROWNFIELD

FIND THE PROJECT EARLY
FOLLOW POD & DEVELOPMENT PLAN
ENTER DURING PRE-FEED / FEED
MAP FACILITIES & PACKAGES
IDENTIFY OWNER, PMC, FEED & EPC
BUILD PARTNERS / CONSORTIUM
ENTER BEFORE EPC PROCUREMENT
JANGAN HANYA MENCARI “TENDER EPC”.
TEMUKAN PROJECT SEJAK AWAL → IKUTI POD / STUDY → MASUK SAAT PRE-FEED & FEED → PETAKAN FACILITY & PACKAGE → TEMUKAN OWNER, PMC, FEED CONTRACTOR & EPC → BANGUN PARTNER / CONSORTIUM → MASUK SEBELUM PROCUREMENT.

ENGINEERING & EPC = INDUK INTELLIGENCE BAGI SELURUH SUPPLY CHAIN MIGAS
FEED / EPC DATA → PIPE → VALVE → PUMP → ELECTRICAL → INSTRUMENTATION → FABRICATION → CONSTRUCTION → INSPECTION → HSE → ICT → MANPOWER → LOGISTICS → CATERING → WATER TREATMENT → DAN PELUANG LAINNYA.